Everpeak Properties
ImmobiliCalcolatore d’investimentoConsulenza privata · da 1 milione di €
EVERPEAK INVESTMENT

Immobili per investire.

Confronta prezzi d’acquisto, dati disponibili sugli affitti e rendimenti lordi. Esplora un immobile e calcola il tuo risultato mensile.

EVERPEAK · DEVELOPMENT

Development projects

Five projects with reviewed source documents and separate scenario economics. Actual purchase prices are on request. All purchase prices, budgets and exit values below are illustrative assumptions.

Klärwerkstraße 1 / 1A

Project visualization, not a photograph of a completed building.

ILLUSTRATIVE SCENARIO · NOT A RETURN FORECAST

Klärwerkstraße 1 / 1A

Actual purchase price on request

Open presentation ↗

Project link ↗

Commercial development potential based on a 2020 study; railway-purpose release and contaminated-land investigations remain unresolved.

Source documents reviewed; current planning status requires confirmation.

ROI over the whole project
ScenarioROIProject profit / loss
Downside-27.41 %-27,762,387 €
Base-3.55 %-3,188,355 €
Upside10.92 %9,370,202 €
Edit assumptions and recalculate

Model inputs, not seller terms

Purchase costs 10%: 6% transfer tax, assumed 2% notary/register and 2% brokerage; design 15% and contingency 10% of hard costs; selling costs 3%. Inputs are editable. This is not a cost estimate, market valuation or assurance of sale or planning approval.

Total project cost89,699,284 €
Net exit proceeds86,510,928 €
Project profit / loss-3,188,355 €
ROI over the whole project-3.55 %
Illustrative annualized return-0.72 %
Gross proceeds needed to break even92,473,488 €
Maximum purchase price at target ROINo positive purchase price achieves the target ROI under these assumptions.

ROI = (sale proceeds after selling costs − total project cost) / total project cost. Total cost includes acquisition, purchase costs, construction, design, contingency, extra works and holding costs over the project period.

Unlevered, before income taxes. Construction budgets assume VAT included; no VAT recovery is modelled. No rental income. Annualized = (net exit / total cost)^(1/years) − 1 assuming all costs occur at the start; this is not cash-flow IRR.

Downside: hard costs +15%, exit −15%, duration +1 year. Upside: hard costs −5%, exit +10%, duration −0.5 year. Purchase and other rates remain unchanged.

Basis and assumptions

  • Uses only Real Case 31,852.33 m² BGF, not the larger theoretical concepts. Hard costs: BGF × €1,900/m². Assumed saleable floor area: 80% of BGF × €3,500/m². Neither the efficiency ratio nor exit price is verified.
  • €4m extra-works allowance for investigations, remediation/site preparation and connections is hypothetical and may be exceeded.

Verify before acquisition

  • Actual acquisition price, current planning consent, saleable floor area, costs and exit proceeds require independent confirmation.
  • All model returns are hypothetical and may be negative.
Discuss this project ↗
Asta-Nielsen-Straße 4

Project visualization, not a photograph of a completed building.

ILLUSTRATIVE SCENARIO · NOT A RETURN FORECAST

Asta-Nielsen-Straße 4

Actual purchase price on request

Open presentation ↗

Project link ↗

Three planned residential buildings with 39 apartments in a June 2026 preliminary application, not an issued building permit.

Source documents reviewed; current planning status requires confirmation.

ROI over the whole project
ScenarioROIProject profit / loss
Downside-7.38 %-1,182,406 €
Base20.70 %2,993,995 €
Upside37.87 %5,275,795 €
Edit assumptions and recalculate

Model inputs, not seller terms

Purchase costs 10%: 6% transfer tax, assumed 2% notary/register and 2% brokerage; design 15% and contingency 10% of hard costs; selling costs 3%. Inputs are editable. This is not a cost estimate, market valuation or assurance of sale or planning approval.

Total project cost14,466,005 €
Net exit proceeds17,460,000 €
Project profit / loss2,993,995 €
ROI over the whole project20.70 %
Illustrative annualized return6.47 %
Gross proceeds needed to break even14,913,407 €
Maximum purchase price at target ROI3,576,359 €

ROI = (sale proceeds after selling costs − total project cost) / total project cost. Total cost includes acquisition, purchase costs, construction, design, contingency, extra works and holding costs over the project period.

Unlevered, before income taxes. Construction budgets assume VAT included; no VAT recovery is modelled. No rental income. Annualized = (net exit / total cost)^(1/years) − 1 assuming all costs occur at the start; this is not cash-flow IRR.

Downside: hard costs +15%, exit −15%, duration +1 year. Upside: hard costs −5%, exit +10%, duration −0.5 year. Purchase and other rates remain unchanged.

Basis and assumptions

  • Hard costs: 2,989.54 m² BGF × €2,600/m². Assumed saleable residential area: 2,400 m² × €7,500/m², not verified Wohnfläche.
  • Netto 2,600.53 m², stated rentable area 2,914.24 m² and BGF are different measures. The 55.71/74.35 m² first-floor discrepancy and upper-floor classification remain unresolved.
  • Existing-building energy class G and 237.1 kWh/(m²a) do not apply to the new development. No parking sales or existing rental income are included.

Verify before acquisition

  • Actual acquisition price, current planning consent, saleable floor area, costs and exit proceeds require independent confirmation.
  • All model returns are hypothetical and may be negative.
Discuss this project ↗
Liebermannstraße 27–37

Project visualization, not a photograph of a completed building.

ILLUSTRATIVE SCENARIO · NOT A RETURN FORECAST

Liebermannstraße 27–37

Actual purchase price on request

Open presentation ↗

Project link ↗

Mixed-use development: 70 apartments, 39 new plus 2 existing commercial units and 95 underground parking spaces in the 2022 permit.

Source documents reviewed; current planning status requires confirmation.

ROI over the whole project
ScenarioROIProject profit / loss
Downside-25.27 %-28,182,807 €
Base-0.15 %-152,059 €
Upside15.10 %14,152,013 €
Edit assumptions and recalculate

Model inputs, not seller terms

Purchase costs 10%: 6% transfer tax, assumed 2% notary/register and 2% brokerage; design 15% and contingency 10% of hard costs; selling costs 3%. Inputs are editable. This is not a cost estimate, market valuation or assurance of sale or planning approval.

Total project cost98,195,188 €
Net exit proceeds98,043,128 €
Project profit / loss-152,059 €
ROI over the whole project-0.15 %
Illustrative annualized return-0.04 %
Gross proceeds needed to break even101,232,152 €
Maximum purchase price at target ROINo positive purchase price achieves the target ROI under these assumptions.

ROI = (sale proceeds after selling costs − total project cost) / total project cost. Total cost includes acquisition, purchase costs, construction, design, contingency, extra works and holding costs over the project period.

Unlevered, before income taxes. Construction budgets assume VAT included; no VAT recovery is modelled. No rental income. Annualized = (net exit / total cost)^(1/years) − 1 assuming all costs occur at the start; this is not cash-flow IRR.

Downside: hard costs +15%, exit −15%, duration +1 year. Upside: hard costs −5%, exit +10%, duration −0.5 year. Purchase and other rates remain unchanged.

Basis and assumptions

  • Hard costs: total BGF 27,678.46 m² × €2,500/m²; an illustrative blended rate, not a DIN 276 estimate.
  • Exit: residential 8,019.24 m² × €8,000 + commercial 11,515.49 m² × €3,000 + 95 parking spaces × €25,000. Index I areas include credited balcony shares. All exit rates are assumed. Current permit validity and final saleable areas need confirmation.

Verify before acquisition

  • Actual acquisition price, current planning consent, saleable floor area, costs and exit proceeds require independent confirmation.
  • All model returns are hypothetical and may be negative.
Discuss this project ↗
Spandauer Burgwall 46 / 48 / 50

Project visualization, not a photograph of a completed building.

ILLUSTRATIVE SCENARIO · NOT A RETURN FORECAST

Spandauer Burgwall 46 / 48 / 50

Actual purchase price on request

Open presentation ↗

Project link ↗

A commercial temporary-accommodation concept with 123 units in two phases; these are not confirmed permanent residential apartments.

Source documents reviewed; current planning status requires confirmation.

ROI over the whole project
ScenarioROIProject profit / loss
Downside-28.37 %-12,049,302 €
Base-4.38 %-1,638,610 €
Upside10.22 %3,651,271 €
Edit assumptions and recalculate

Model inputs, not seller terms

Purchase costs 10%: 6% transfer tax, assumed 2% notary/register and 2% brokerage; design 15% and contingency 10% of hard costs; selling costs 3%. Inputs are editable. This is not a cost estimate, market valuation or assurance of sale or planning approval.

Total project cost37,431,610 €
Net exit proceeds35,793,000 €
Project profit / loss-1,638,610 €
ROI over the whole project-4.38 %
Illustrative annualized return-1.11 %
Gross proceeds needed to break even38,589,289 €
Maximum purchase price at target ROINo positive purchase price achieves the target ROI under these assumptions.

ROI = (sale proceeds after selling costs − total project cost) / total project cost. Total cost includes acquisition, purchase costs, construction, design, contingency, extra works and holding costs over the project period.

Unlevered, before income taxes. Construction budgets assume VAT included; no VAT recovery is modelled. No rental income. Annualized = (net exit / total cost)^(1/years) − 1 assuming all costs occur at the start; this is not cash-flow IRR.

Downside: hard costs +15%, exit −15%, duration +1 year. Upside: hard costs −5%, exit +10%, duration −0.5 year. Purchase and other rates remain unchanged.

Basis and assumptions

  • Hard costs: enclosed BGF A 10,803.87 m² × €2,400/m². Hypothetical whole-project exit: 123 × €300,000 = €36.9m, not approved individual apartment sales.
  • No confirmed operator or purchaser, no capitalized invented rent. The €1m extra allowance is not a flood-protection, basement or fit-out estimate.

Verify before acquisition

  • Actual acquisition price, current planning consent, saleable floor area, costs and exit proceeds require independent confirmation.
  • All model returns are hypothetical and may be negative.
Discuss this project ↗
Wilhelm-von-Siemens-Straße 32

Project visualization, not a photograph of a completed building.

ILLUSTRATIVE SCENARIO · NOT A RETURN FORECAST

Wilhelm-von-Siemens-Straße 32

Actual purchase price on request

Open presentation ↗

Project link ↗

The February 2026 student-housing concept is separate from the older medical-use preliminary decision.

Source documents reviewed; current planning status requires confirmation.

ROI over the whole project
ScenarioROIProject profit / loss
Downside-14.08 %-4,232,174 €
Base13.82 %3,688,545 €
Upside30.83 %7,872,368 €
Edit assumptions and recalculate

Model inputs, not seller terms

Purchase costs 10%: 6% transfer tax, assumed 2% notary/register and 2% brokerage; design 15% and contingency 10% of hard costs; selling costs 3%. Inputs are editable. This is not a cost estimate, market valuation or assurance of sale or planning approval.

Total project cost26,683,125 €
Net exit proceeds30,371,670 €
Project profit / loss3,688,545 €
ROI over the whole project13.82 %
Illustrative annualized return3.29 %
Gross proceeds needed to break even27,508,376 €
Maximum purchase price at target ROI2,251,455 €

ROI = (sale proceeds after selling costs − total project cost) / total project cost. Total cost includes acquisition, purchase costs, construction, design, contingency, extra works and holding costs over the project period.

Unlevered, before income taxes. Construction budgets assume VAT included; no VAT recovery is modelled. No rental income. Annualized = (net exit / total cost)^(1/years) − 1 assuming all costs occur at the start; this is not cash-flow IRR.

Downside: hard costs +15%, exit −15%, duration +1 year. Upside: hard costs −5%, exit +10%, duration −0.5 year. Purchase and other rates remain unchanged.

Basis and assumptions

  • Hard costs use 7,455 m² of GFZ calculation area × €2,300/m² as a preliminary proxy, not confirmed BGF. Model exit: 70% of 7,455 m² × €6,000/m².
  • Area efficiency, prices, residential use and saleability are assumptions. No confirmed apartment count or transferred approval from the medical scheme.

Verify before acquisition

  • Actual acquisition price, current planning consent, saleable floor area, costs and exit proceeds require independent confirmation.
  • All model returns are hypothetical and may be negative.
Discuss this project ↗

Unlevered, before income taxes. Construction budgets assume VAT included; no VAT recovery is modelled. No rental income. Annualized = (net exit / total cost)^(1/years) − 1 assuming all costs occur at the start; this is not cash-flow IRR. Downside: hard costs +15%, exit −15%, duration +1 year. Upside: hard costs −5%, exit +10%, duration −0.5 year. Purchase and other rates remain unchanged.

External context: IBB citywide new-build asking-price median, not a valuation of these projects; Berlin tax authority: 6% transfer tax. Other prices and budgets are independent illustrative assumptions. IBB 2025 · Berlin · Grunderwerbsteuer

IMMOBILI D’INVESTIMENTO ATTUALI

Immobili per il tuo investimento

Gli immobili con dati sull’affitto compaiono per primi. Ogni scheda indica la fonte di questi dati.

Rendimento lordo da locazione = affitto annuo netto delle spese ÷ prezzo d’acquisto. Prima dei costi d’acquisto e gestione, del finanziamento e delle imposte. ·

Il tuo immobile. Il tuo calcolo.

Esamina i dettagli dell’immobile e modifica il tuo scenario di finanziamento.

EUR · analisi mensile
Dati dell’immobile

Acquista un edificio residenziale e commerciale di 12 locali ad alto rendimento a Rhinow

Prezzo d’acquisto—
Superficie abitabile—
Stato della locazione—
Classe energetica—
Affitto netto delle spese / mese—
Rendimento lordo da locazione—

Cosa dovresti sapere su questo immobile

IL TUO RISULTATO MENSILE

Quanto rimane al mese?

Ipotesi di calcolo modificabili. Non è un’offerta di finanziamento.

Non hai ancora le tue cifre?

Modifica il prestito e le altre ipotesi +

Capitale proprio inclusi i costi accessori d’acquisto. Costi del proprietario incluse le spese non addebitabili all’inquilino e l’accantonamento periodico. Tutte le percentuali sono ipotesi scelte liberamente.

Quanto ti rimane al mese, prima delle imposte—

Affitto usato nel calcolo—
Le tue spese ricorrenti—
La tua rata del prestito—
Visualizza il rendimento percentuale +

Il rendimento confronta l’affitto annuo con il prezzo d’acquisto. Non è il denaro che ti rimane dopo la rata del prestito.

Rendimento lordo da locazione—
Rendimento netto prima del finanziamento¹—
Cosa succede con meno affitto o interessi più alti? +

¹ Affitto annuo dopo la perdita ipotizzata, meno i costi del proprietario, diviso per il prezzo d’acquisto inclusi i costi accessori. Esclusi imposte, rivalutazione, ristrutturazioni una tantum e costi di vendita. Rata del prestito basata sull’annualità iniziale; non è un piano di ammortamento.

CHIARO IN 30 SECONDI

Ecco come funziona un immobile dato in affitto.

Qui acquisti un intero immobile da dare in affitto. Non investi denaro tramite questo sito.

1

Acquisti un immobile.

Paghi con fondi propri e, se necessario, un prestito. Al prezzo d’acquisto si aggiungono i costi accessori.

2

Ricevi l’affitto.

Calcola il canone al netto di riscaldamento e spese di gestione. Gli importi destinati a queste spese non sono reddito liberamente disponibile.

3

Paghi le spese.

Si sottraggono la rata del prestito e le tue spese ricorrenti. Il calcolatore mostra ciò che rimane.

Affitto dopo la perdita ipotizzata−Le tue spese ricorrenti−Rata del prestito=Quanto rimane ogni mese
UN BUON PROCESSO. SENZA SCORCIATOIE.

Dai documenti a una decisione chiara.

01

Vedere l’insieme.

La scheda dell’immobile, il contratto di locazione, il piano economico condominiale e le condizioni dell’immobile forniscono insieme un quadro completo.

02

Calcolare nel dettaglio.

Affitto, finanziamento e spese ricorrenti. Con le tue ipotesi e un’attenzione ai rischi.

03

Chiarire di persona.

Discutere le questioni aperte e le condizioni prima del passo successivo.

BUONE DOMANDE, RISPOSTE SEMPLICI

Cosa dovresti capire prima dell’acquisto.

«Affitto» significa automaticamente «guadagno»?

No. Dall’affitto si sottraggono le spese ricorrenti e, se presente, la rata del prestito. Il calcolatore mostra quanto rimane prima delle imposte.

Cosa significa un risultato negativo?

In questo calcolo, l’affitto inserito non copre tutte le spese. Devi aggiungere ogni mese l’importo indicato usando altri fondi.

Perché alcuni campi sono vuoti?

Per questo immobile non sono ancora disponibili dati verificati. Non inventiamo un affitto. Inserisci i valori noti oppure esamina i documenti con noi.

Posso fare affidamento sul risultato?

È una simulazione basata sui tuoi dati, non una garanzia. Un affitto più basso, riparazioni o condizioni di prestito diverse cambiano il risultato. Non sono inclusi imposte, ristrutturazioni una tantum e costi di vendita.

Cosa succede quando invio una richiesta?

Everpeak riceve i tuoi recapiti, l’immobile selezionato e il tuo calcolo. Possiamo quindi discutere con te i punti aperti. La richiesta non comporta l’acquisto di un immobile.

EVERPEAK PRIVATE

Da 1 milione di euro. Il tuo capitale. La tua prospettiva.

Parliamo di investimenti privati ↗
5,0 ★★★★★

33 recensioni su Google

«Comunicazione e servizio eccellenti. Pavel è reattivo, disponibile e un vero professionista.» — Angela

«È dalla parte del cliente e ne difende gli interessi: una rarità a Berlino! Altamente raccomandato.» — Artem S.

«Ogni volta il risultato è stato addirittura migliore di quanto avevamo previsto.» — Natalia H.

Tradotto dal russo

Leggi tutte le recensioni su Google

IL PROSSIMO PASSO

Le tue domande. Il nostro sguardo comune.

Parliamo dell’immobile e del tuo scenario di calcolo.
In modo personale, concreto e senza impegno.

Con la richiesta invii a Everpeak i tuoi recapiti e lo scenario di calcolo attuale. Informativa sulla privacy