Project visualization, not a photograph of a completed building.
ILLUSTRATIVE SCENARIO · NOT A RETURN FORECASTWilhelm-von-Siemens-Straße 32
Actual purchase price on request
Project link ↗The February 2026 student-housing concept is separate from the older medical-use preliminary decision.
Source documents reviewed; current planning status requires confirmation.
| Scenario | ROI | Project profit / loss |
|---|---|---|
| Downside | -14.08 % | -4,232,174 € |
| Base | 13.82 % | 3,688,545 € |
| Upside | 30.83 % | 7,872,368 € |
Edit assumptions and recalculate
Model inputs, not seller terms
Purchase costs 10%: 6% transfer tax, assumed 2% notary/register and 2% brokerage; design 15% and contingency 10% of hard costs; selling costs 3%. Inputs are editable. This is not a cost estimate, market valuation or assurance of sale or planning approval.
ROI = (sale proceeds after selling costs − total project cost) / total project cost. Total cost includes acquisition, purchase costs, construction, design, contingency, extra works and holding costs over the project period.
Unlevered, before income taxes. Construction budgets assume VAT included; no VAT recovery is modelled. No rental income. Annualized = (net exit / total cost)^(1/years) − 1 assuming all costs occur at the start; this is not cash-flow IRR.
Downside: hard costs +15%, exit −15%, duration +1 year. Upside: hard costs −5%, exit +10%, duration −0.5 year. Purchase and other rates remain unchanged.
Basis and assumptions
- Hard costs use 7,455 m² of GFZ calculation area × €2,300/m² as a preliminary proxy, not confirmed BGF. Model exit: 70% of 7,455 m² × €6,000/m².
- Area efficiency, prices, residential use and saleability are assumptions. No confirmed apartment count or transferred approval from the medical scheme.
Verify before acquisition
- Actual acquisition price, current planning consent, saleable floor area, costs and exit proceeds require independent confirmation.
- All model returns are hypothetical and may be negative.



