Everpeak Properties
BiensSimulateur d’investissementConseil privé · à partir de 1 million d’€
EVERPEAK INVESTMENT

Des biens pour investir.

Comparez les prix d’achat, les loyers disponibles et les rendements bruts. Découvrez un bien et calculez votre résultat mensuel.

EVERPEAK · DEVELOPMENT

Development projects

Five projects with reviewed source documents and separate scenario economics. Actual purchase prices are on request. All purchase prices, budgets and exit values below are illustrative assumptions.

Klärwerkstraße 1 / 1A

Project visualization, not a photograph of a completed building.

ILLUSTRATIVE SCENARIO · NOT A RETURN FORECAST

Klärwerkstraße 1 / 1A

Actual purchase price on request

Open presentation ↗

Project link ↗

Commercial development potential based on a 2020 study; railway-purpose release and contaminated-land investigations remain unresolved.

Source documents reviewed; current planning status requires confirmation.

ROI over the whole project
ScenarioROIProject profit / loss
Downside-27.41 %-27,762,387 €
Base-3.55 %-3,188,355 €
Upside10.92 %9,370,202 €
Edit assumptions and recalculate

Model inputs, not seller terms

Purchase costs 10%: 6% transfer tax, assumed 2% notary/register and 2% brokerage; design 15% and contingency 10% of hard costs; selling costs 3%. Inputs are editable. This is not a cost estimate, market valuation or assurance of sale or planning approval.

Total project cost89,699,284 €
Net exit proceeds86,510,928 €
Project profit / loss-3,188,355 €
ROI over the whole project-3.55 %
Illustrative annualized return-0.72 %
Gross proceeds needed to break even92,473,488 €
Maximum purchase price at target ROINo positive purchase price achieves the target ROI under these assumptions.

ROI = (sale proceeds after selling costs − total project cost) / total project cost. Total cost includes acquisition, purchase costs, construction, design, contingency, extra works and holding costs over the project period.

Unlevered, before income taxes. Construction budgets assume VAT included; no VAT recovery is modelled. No rental income. Annualized = (net exit / total cost)^(1/years) − 1 assuming all costs occur at the start; this is not cash-flow IRR.

Downside: hard costs +15%, exit −15%, duration +1 year. Upside: hard costs −5%, exit +10%, duration −0.5 year. Purchase and other rates remain unchanged.

Basis and assumptions

  • Uses only Real Case 31,852.33 m² BGF, not the larger theoretical concepts. Hard costs: BGF × €1,900/m². Assumed saleable floor area: 80% of BGF × €3,500/m². Neither the efficiency ratio nor exit price is verified.
  • €4m extra-works allowance for investigations, remediation/site preparation and connections is hypothetical and may be exceeded.

Verify before acquisition

  • Actual acquisition price, current planning consent, saleable floor area, costs and exit proceeds require independent confirmation.
  • All model returns are hypothetical and may be negative.
Discuss this project ↗
Asta-Nielsen-Straße 4

Project visualization, not a photograph of a completed building.

ILLUSTRATIVE SCENARIO · NOT A RETURN FORECAST

Asta-Nielsen-Straße 4

Actual purchase price on request

Open presentation ↗

Project link ↗

Three planned residential buildings with 39 apartments in a June 2026 preliminary application, not an issued building permit.

Source documents reviewed; current planning status requires confirmation.

ROI over the whole project
ScenarioROIProject profit / loss
Downside-7.38 %-1,182,406 €
Base20.70 %2,993,995 €
Upside37.87 %5,275,795 €
Edit assumptions and recalculate

Model inputs, not seller terms

Purchase costs 10%: 6% transfer tax, assumed 2% notary/register and 2% brokerage; design 15% and contingency 10% of hard costs; selling costs 3%. Inputs are editable. This is not a cost estimate, market valuation or assurance of sale or planning approval.

Total project cost14,466,005 €
Net exit proceeds17,460,000 €
Project profit / loss2,993,995 €
ROI over the whole project20.70 %
Illustrative annualized return6.47 %
Gross proceeds needed to break even14,913,407 €
Maximum purchase price at target ROI3,576,359 €

ROI = (sale proceeds after selling costs − total project cost) / total project cost. Total cost includes acquisition, purchase costs, construction, design, contingency, extra works and holding costs over the project period.

Unlevered, before income taxes. Construction budgets assume VAT included; no VAT recovery is modelled. No rental income. Annualized = (net exit / total cost)^(1/years) − 1 assuming all costs occur at the start; this is not cash-flow IRR.

Downside: hard costs +15%, exit −15%, duration +1 year. Upside: hard costs −5%, exit +10%, duration −0.5 year. Purchase and other rates remain unchanged.

Basis and assumptions

  • Hard costs: 2,989.54 m² BGF × €2,600/m². Assumed saleable residential area: 2,400 m² × €7,500/m², not verified Wohnfläche.
  • Netto 2,600.53 m², stated rentable area 2,914.24 m² and BGF are different measures. The 55.71/74.35 m² first-floor discrepancy and upper-floor classification remain unresolved.
  • Existing-building energy class G and 237.1 kWh/(m²a) do not apply to the new development. No parking sales or existing rental income are included.

Verify before acquisition

  • Actual acquisition price, current planning consent, saleable floor area, costs and exit proceeds require independent confirmation.
  • All model returns are hypothetical and may be negative.
Discuss this project ↗
Liebermannstraße 27–37

Project visualization, not a photograph of a completed building.

ILLUSTRATIVE SCENARIO · NOT A RETURN FORECAST

Liebermannstraße 27–37

Actual purchase price on request

Open presentation ↗

Project link ↗

Mixed-use development: 70 apartments, 39 new plus 2 existing commercial units and 95 underground parking spaces in the 2022 permit.

Source documents reviewed; current planning status requires confirmation.

ROI over the whole project
ScenarioROIProject profit / loss
Downside-25.27 %-28,182,807 €
Base-0.15 %-152,059 €
Upside15.10 %14,152,013 €
Edit assumptions and recalculate

Model inputs, not seller terms

Purchase costs 10%: 6% transfer tax, assumed 2% notary/register and 2% brokerage; design 15% and contingency 10% of hard costs; selling costs 3%. Inputs are editable. This is not a cost estimate, market valuation or assurance of sale or planning approval.

Total project cost98,195,188 €
Net exit proceeds98,043,128 €
Project profit / loss-152,059 €
ROI over the whole project-0.15 %
Illustrative annualized return-0.04 %
Gross proceeds needed to break even101,232,152 €
Maximum purchase price at target ROINo positive purchase price achieves the target ROI under these assumptions.

ROI = (sale proceeds after selling costs − total project cost) / total project cost. Total cost includes acquisition, purchase costs, construction, design, contingency, extra works and holding costs over the project period.

Unlevered, before income taxes. Construction budgets assume VAT included; no VAT recovery is modelled. No rental income. Annualized = (net exit / total cost)^(1/years) − 1 assuming all costs occur at the start; this is not cash-flow IRR.

Downside: hard costs +15%, exit −15%, duration +1 year. Upside: hard costs −5%, exit +10%, duration −0.5 year. Purchase and other rates remain unchanged.

Basis and assumptions

  • Hard costs: total BGF 27,678.46 m² × €2,500/m²; an illustrative blended rate, not a DIN 276 estimate.
  • Exit: residential 8,019.24 m² × €8,000 + commercial 11,515.49 m² × €3,000 + 95 parking spaces × €25,000. Index I areas include credited balcony shares. All exit rates are assumed. Current permit validity and final saleable areas need confirmation.

Verify before acquisition

  • Actual acquisition price, current planning consent, saleable floor area, costs and exit proceeds require independent confirmation.
  • All model returns are hypothetical and may be negative.
Discuss this project ↗
Spandauer Burgwall 46 / 48 / 50

Project visualization, not a photograph of a completed building.

ILLUSTRATIVE SCENARIO · NOT A RETURN FORECAST

Spandauer Burgwall 46 / 48 / 50

Actual purchase price on request

Open presentation ↗

Project link ↗

A commercial temporary-accommodation concept with 123 units in two phases; these are not confirmed permanent residential apartments.

Source documents reviewed; current planning status requires confirmation.

ROI over the whole project
ScenarioROIProject profit / loss
Downside-28.37 %-12,049,302 €
Base-4.38 %-1,638,610 €
Upside10.22 %3,651,271 €
Edit assumptions and recalculate

Model inputs, not seller terms

Purchase costs 10%: 6% transfer tax, assumed 2% notary/register and 2% brokerage; design 15% and contingency 10% of hard costs; selling costs 3%. Inputs are editable. This is not a cost estimate, market valuation or assurance of sale or planning approval.

Total project cost37,431,610 €
Net exit proceeds35,793,000 €
Project profit / loss-1,638,610 €
ROI over the whole project-4.38 %
Illustrative annualized return-1.11 %
Gross proceeds needed to break even38,589,289 €
Maximum purchase price at target ROINo positive purchase price achieves the target ROI under these assumptions.

ROI = (sale proceeds after selling costs − total project cost) / total project cost. Total cost includes acquisition, purchase costs, construction, design, contingency, extra works and holding costs over the project period.

Unlevered, before income taxes. Construction budgets assume VAT included; no VAT recovery is modelled. No rental income. Annualized = (net exit / total cost)^(1/years) − 1 assuming all costs occur at the start; this is not cash-flow IRR.

Downside: hard costs +15%, exit −15%, duration +1 year. Upside: hard costs −5%, exit +10%, duration −0.5 year. Purchase and other rates remain unchanged.

Basis and assumptions

  • Hard costs: enclosed BGF A 10,803.87 m² × €2,400/m². Hypothetical whole-project exit: 123 × €300,000 = €36.9m, not approved individual apartment sales.
  • No confirmed operator or purchaser, no capitalized invented rent. The €1m extra allowance is not a flood-protection, basement or fit-out estimate.

Verify before acquisition

  • Actual acquisition price, current planning consent, saleable floor area, costs and exit proceeds require independent confirmation.
  • All model returns are hypothetical and may be negative.
Discuss this project ↗
Wilhelm-von-Siemens-Straße 32

Project visualization, not a photograph of a completed building.

ILLUSTRATIVE SCENARIO · NOT A RETURN FORECAST

Wilhelm-von-Siemens-Straße 32

Actual purchase price on request

Open presentation ↗

Project link ↗

The February 2026 student-housing concept is separate from the older medical-use preliminary decision.

Source documents reviewed; current planning status requires confirmation.

ROI over the whole project
ScenarioROIProject profit / loss
Downside-14.08 %-4,232,174 €
Base13.82 %3,688,545 €
Upside30.83 %7,872,368 €
Edit assumptions and recalculate

Model inputs, not seller terms

Purchase costs 10%: 6% transfer tax, assumed 2% notary/register and 2% brokerage; design 15% and contingency 10% of hard costs; selling costs 3%. Inputs are editable. This is not a cost estimate, market valuation or assurance of sale or planning approval.

Total project cost26,683,125 €
Net exit proceeds30,371,670 €
Project profit / loss3,688,545 €
ROI over the whole project13.82 %
Illustrative annualized return3.29 %
Gross proceeds needed to break even27,508,376 €
Maximum purchase price at target ROI2,251,455 €

ROI = (sale proceeds after selling costs − total project cost) / total project cost. Total cost includes acquisition, purchase costs, construction, design, contingency, extra works and holding costs over the project period.

Unlevered, before income taxes. Construction budgets assume VAT included; no VAT recovery is modelled. No rental income. Annualized = (net exit / total cost)^(1/years) − 1 assuming all costs occur at the start; this is not cash-flow IRR.

Downside: hard costs +15%, exit −15%, duration +1 year. Upside: hard costs −5%, exit +10%, duration −0.5 year. Purchase and other rates remain unchanged.

Basis and assumptions

  • Hard costs use 7,455 m² of GFZ calculation area × €2,300/m² as a preliminary proxy, not confirmed BGF. Model exit: 70% of 7,455 m² × €6,000/m².
  • Area efficiency, prices, residential use and saleability are assumptions. No confirmed apartment count or transferred approval from the medical scheme.

Verify before acquisition

  • Actual acquisition price, current planning consent, saleable floor area, costs and exit proceeds require independent confirmation.
  • All model returns are hypothetical and may be negative.
Discuss this project ↗

Unlevered, before income taxes. Construction budgets assume VAT included; no VAT recovery is modelled. No rental income. Annualized = (net exit / total cost)^(1/years) − 1 assuming all costs occur at the start; this is not cash-flow IRR. Downside: hard costs +15%, exit −15%, duration +1 year. Upside: hard costs −5%, exit +10%, duration −0.5 year. Purchase and other rates remain unchanged.

External context: IBB citywide new-build asking-price median, not a valuation of these projects; Berlin tax authority: 6% transfer tax. Other prices and budgets are independent illustrative assumptions. IBB 2025 · Berlin · Grunderwerbsteuer

BIENS D’INVESTISSEMENT ACTUELS

Des biens pour votre investissement

Les biens disposant de données locatives apparaissent en premier. Chaque fiche indique la source de ces données.

Rendement locatif brut = loyer annuel hors charges ÷ prix d’achat. Avant frais d’acquisition, charges courantes, financement et impôts. ·

Votre bien. Votre calcul.

Examinez les détails du bien et ajustez votre scénario de financement.

EUR · analyse mensuelle
Données du bien

Acheter un immeuble résidentiel et commercial de 12 pièces à haut rendement à Rhinow

Prix d’achat—
Surface habitable—
Situation locative—
Classe énergétique—
Loyer hors charges / mois—
Rendement locatif brut—

Ce que vous devez savoir sur ce bien

VOTRE RÉSULTAT MENSUEL

Que reste-t-il par mois ?

Hypothèses de calcul modifiables. Ce n’est pas une offre de financement.

Vous n’avez pas encore vos propres chiffres ?

Ajuster le prêt et les autres hypothèses +

Apport personnel incluant les frais d’acquisition. Charges du propriétaire incluant les charges non récupérables et votre provision de réserve régulière. Tous les pourcentages sont des hypothèses librement choisies.

Ce qu’il vous reste par mois — avant impôts—

Loyer retenu pour le calcul—
Vos charges récurrentes—
Votre mensualité de prêt—
Voir le rendement en pourcentage +

Le rendement compare le loyer annuel au prix d’achat. Ce n’est pas la somme qui vous reste après la mensualité du prêt.

Rendement locatif brut—
Rendement net avant financement¹—
Que se passe-t-il si le loyer baisse ou si les taux augmentent ? +

¹ Loyer annuel après perte supposée, moins charges du propriétaire, divisé par le prix d’achat incluant les frais d’acquisition. Hors impôts, plus-value, travaux ponctuels et frais de vente. Mensualité du prêt calculée selon l’annuité initiale ; ce n’est pas un tableau d’amortissement.

COMPRENDRE EN 30 SECONDES

Voici comment fonctionne un bien en location.

Vous achetez ici un bien entier pour le mettre en location. Vous n’investissez pas d’argent par l’intermédiaire de ce site.

1

Vous achetez un bien.

Vous payez avec vos fonds propres et, si nécessaire, un prêt. Des frais d’acquisition s’ajoutent au prix d’achat.

2

Vous percevez un loyer.

Calculez avec le loyer hors charges. Les sommes destinées au chauffage et aux charges d’exploitation ne constituent pas un revenu librement disponible.

3

Vous payez les dépenses.

La mensualité du prêt et vos charges récurrentes sont déduites. Le simulateur affiche ce qu’il reste ensuite.

Loyer après perte supposée−Vos charges récurrentes−Mensualité du prêt=Ce qu’il reste chaque mois
UNE BONNE MÉTHODE. SANS RACCOURCI.

Des documents à une décision claire.

01

Voir l’ensemble.

Le dossier du bien, le bail, le budget de la copropriété et l’état du bien donnent ensemble une vue d’ensemble.

02

Calculer en détail.

Loyer, financement et charges récurrentes. Avec vos hypothèses et en tenant compte des risques.

03

Clarifier ensemble.

Discuter des questions ouvertes et des conditions avant de passer à l’étape suivante.

DE BONNES QUESTIONS, DES RÉPONSES SIMPLES

Ce que vous devriez comprendre avant d’acheter.

« Loyer » signifie-t-il automatiquement « bénéfice » ?

Non. Les charges récurrentes et, le cas échéant, la mensualité du prêt sont déduites du loyer. Le simulateur affiche ce qu’il reste ensuite, avant impôts.

Que signifie un résultat négatif ?

Dans ce calcul, le loyer saisi ne couvre pas toutes les dépenses. Vous devez ajouter chaque mois le montant affiché à partir d’autres fonds.

Pourquoi certains champs sont-ils vides ?

Nous ne disposons pas encore de données vérifiées pour ce bien. Nous n’inventons pas de loyer. Saisissez les valeurs connues ou examinez les documents avec nous.

Puis-je me fier au résultat ?

Il s’agit d’une simulation basée sur vos données, pas d’un engagement. Un loyer inférieur, des réparations ou d’autres conditions de prêt modifient le résultat. Les impôts, travaux ponctuels et frais de vente ne sont pas inclus.

Que se passe-t-il si j’envoie une demande ?

Everpeak reçoit vos coordonnées, le bien sélectionné et votre calcul. Nous pouvons ensuite discuter avec vous des points en suspens. La demande ne déclenche aucun achat immobilier.

EVERPEAK PRIVATE

À partir de 1 million d’euros. Votre capital. Votre perspective.

Discuter d’un investissement privé ↗
5,0 ★★★★★

33 avis sur Google

«Excellente communication et service. Pavel est réactif, accessible et un vrai professionnel.» — Angela

«Il est aux côtés du client et défend ses intérêts – une rareté à Berlin ! Fortement recommandé.» — Artem S.

«À chaque fois, le résultat était encore meilleur que prévu.» — Natalia H.

Traduit du russe

Lire tous les avis sur Google

LA PROCHAINE ÉTAPE

Vos questions. Notre regard commun.

Nous discutons du bien et de votre scénario de calcul.
Un échange personnel, concret et sans engagement.

En envoyant votre demande, vous transmettez à Everpeak vos coordonnées et le scénario de calcul actuel. Informations sur la protection des données