Everpeak Properties
InmueblesCalculadora de inversiónAsesoramiento privado · desde 1 millón de €
EVERPEAK INVESTMENT

Inmuebles para invertir.

Compara precios de compra, datos de alquiler disponibles y rentabilidades brutas. Explora un inmueble y calcula tu resultado mensual.

EVERPEAK · DEVELOPMENT

Development projects

Five projects with reviewed source documents and separate scenario economics. Actual purchase prices are on request. All purchase prices, budgets and exit values below are illustrative assumptions.

Klärwerkstraße 1 / 1A

Project visualization, not a photograph of a completed building.

ILLUSTRATIVE SCENARIO · NOT A RETURN FORECAST

Klärwerkstraße 1 / 1A

Actual purchase price on request

Open presentation ↗

Project link ↗

Commercial development potential based on a 2020 study; railway-purpose release and contaminated-land investigations remain unresolved.

Source documents reviewed; current planning status requires confirmation.

ROI over the whole project
ScenarioROIProject profit / loss
Downside-27.41 %-27,762,387 €
Base-3.55 %-3,188,355 €
Upside10.92 %9,370,202 €
Edit assumptions and recalculate

Model inputs, not seller terms

Purchase costs 10%: 6% transfer tax, assumed 2% notary/register and 2% brokerage; design 15% and contingency 10% of hard costs; selling costs 3%. Inputs are editable. This is not a cost estimate, market valuation or assurance of sale or planning approval.

Total project cost89,699,284 €
Net exit proceeds86,510,928 €
Project profit / loss-3,188,355 €
ROI over the whole project-3.55 %
Illustrative annualized return-0.72 %
Gross proceeds needed to break even92,473,488 €
Maximum purchase price at target ROINo positive purchase price achieves the target ROI under these assumptions.

ROI = (sale proceeds after selling costs − total project cost) / total project cost. Total cost includes acquisition, purchase costs, construction, design, contingency, extra works and holding costs over the project period.

Unlevered, before income taxes. Construction budgets assume VAT included; no VAT recovery is modelled. No rental income. Annualized = (net exit / total cost)^(1/years) − 1 assuming all costs occur at the start; this is not cash-flow IRR.

Downside: hard costs +15%, exit −15%, duration +1 year. Upside: hard costs −5%, exit +10%, duration −0.5 year. Purchase and other rates remain unchanged.

Basis and assumptions

  • Uses only Real Case 31,852.33 m² BGF, not the larger theoretical concepts. Hard costs: BGF × €1,900/m². Assumed saleable floor area: 80% of BGF × €3,500/m². Neither the efficiency ratio nor exit price is verified.
  • €4m extra-works allowance for investigations, remediation/site preparation and connections is hypothetical and may be exceeded.

Verify before acquisition

  • Actual acquisition price, current planning consent, saleable floor area, costs and exit proceeds require independent confirmation.
  • All model returns are hypothetical and may be negative.
Discuss this project ↗
Asta-Nielsen-Straße 4

Project visualization, not a photograph of a completed building.

ILLUSTRATIVE SCENARIO · NOT A RETURN FORECAST

Asta-Nielsen-Straße 4

Actual purchase price on request

Open presentation ↗

Project link ↗

Three planned residential buildings with 39 apartments in a June 2026 preliminary application, not an issued building permit.

Source documents reviewed; current planning status requires confirmation.

ROI over the whole project
ScenarioROIProject profit / loss
Downside-7.38 %-1,182,406 €
Base20.70 %2,993,995 €
Upside37.87 %5,275,795 €
Edit assumptions and recalculate

Model inputs, not seller terms

Purchase costs 10%: 6% transfer tax, assumed 2% notary/register and 2% brokerage; design 15% and contingency 10% of hard costs; selling costs 3%. Inputs are editable. This is not a cost estimate, market valuation or assurance of sale or planning approval.

Total project cost14,466,005 €
Net exit proceeds17,460,000 €
Project profit / loss2,993,995 €
ROI over the whole project20.70 %
Illustrative annualized return6.47 %
Gross proceeds needed to break even14,913,407 €
Maximum purchase price at target ROI3,576,359 €

ROI = (sale proceeds after selling costs − total project cost) / total project cost. Total cost includes acquisition, purchase costs, construction, design, contingency, extra works and holding costs over the project period.

Unlevered, before income taxes. Construction budgets assume VAT included; no VAT recovery is modelled. No rental income. Annualized = (net exit / total cost)^(1/years) − 1 assuming all costs occur at the start; this is not cash-flow IRR.

Downside: hard costs +15%, exit −15%, duration +1 year. Upside: hard costs −5%, exit +10%, duration −0.5 year. Purchase and other rates remain unchanged.

Basis and assumptions

  • Hard costs: 2,989.54 m² BGF × €2,600/m². Assumed saleable residential area: 2,400 m² × €7,500/m², not verified Wohnfläche.
  • Netto 2,600.53 m², stated rentable area 2,914.24 m² and BGF are different measures. The 55.71/74.35 m² first-floor discrepancy and upper-floor classification remain unresolved.
  • Existing-building energy class G and 237.1 kWh/(m²a) do not apply to the new development. No parking sales or existing rental income are included.

Verify before acquisition

  • Actual acquisition price, current planning consent, saleable floor area, costs and exit proceeds require independent confirmation.
  • All model returns are hypothetical and may be negative.
Discuss this project ↗
Liebermannstraße 27–37

Project visualization, not a photograph of a completed building.

ILLUSTRATIVE SCENARIO · NOT A RETURN FORECAST

Liebermannstraße 27–37

Actual purchase price on request

Open presentation ↗

Project link ↗

Mixed-use development: 70 apartments, 39 new plus 2 existing commercial units and 95 underground parking spaces in the 2022 permit.

Source documents reviewed; current planning status requires confirmation.

ROI over the whole project
ScenarioROIProject profit / loss
Downside-25.27 %-28,182,807 €
Base-0.15 %-152,059 €
Upside15.10 %14,152,013 €
Edit assumptions and recalculate

Model inputs, not seller terms

Purchase costs 10%: 6% transfer tax, assumed 2% notary/register and 2% brokerage; design 15% and contingency 10% of hard costs; selling costs 3%. Inputs are editable. This is not a cost estimate, market valuation or assurance of sale or planning approval.

Total project cost98,195,188 €
Net exit proceeds98,043,128 €
Project profit / loss-152,059 €
ROI over the whole project-0.15 %
Illustrative annualized return-0.04 %
Gross proceeds needed to break even101,232,152 €
Maximum purchase price at target ROINo positive purchase price achieves the target ROI under these assumptions.

ROI = (sale proceeds after selling costs − total project cost) / total project cost. Total cost includes acquisition, purchase costs, construction, design, contingency, extra works and holding costs over the project period.

Unlevered, before income taxes. Construction budgets assume VAT included; no VAT recovery is modelled. No rental income. Annualized = (net exit / total cost)^(1/years) − 1 assuming all costs occur at the start; this is not cash-flow IRR.

Downside: hard costs +15%, exit −15%, duration +1 year. Upside: hard costs −5%, exit +10%, duration −0.5 year. Purchase and other rates remain unchanged.

Basis and assumptions

  • Hard costs: total BGF 27,678.46 m² × €2,500/m²; an illustrative blended rate, not a DIN 276 estimate.
  • Exit: residential 8,019.24 m² × €8,000 + commercial 11,515.49 m² × €3,000 + 95 parking spaces × €25,000. Index I areas include credited balcony shares. All exit rates are assumed. Current permit validity and final saleable areas need confirmation.

Verify before acquisition

  • Actual acquisition price, current planning consent, saleable floor area, costs and exit proceeds require independent confirmation.
  • All model returns are hypothetical and may be negative.
Discuss this project ↗
Spandauer Burgwall 46 / 48 / 50

Project visualization, not a photograph of a completed building.

ILLUSTRATIVE SCENARIO · NOT A RETURN FORECAST

Spandauer Burgwall 46 / 48 / 50

Actual purchase price on request

Open presentation ↗

Project link ↗

A commercial temporary-accommodation concept with 123 units in two phases; these are not confirmed permanent residential apartments.

Source documents reviewed; current planning status requires confirmation.

ROI over the whole project
ScenarioROIProject profit / loss
Downside-28.37 %-12,049,302 €
Base-4.38 %-1,638,610 €
Upside10.22 %3,651,271 €
Edit assumptions and recalculate

Model inputs, not seller terms

Purchase costs 10%: 6% transfer tax, assumed 2% notary/register and 2% brokerage; design 15% and contingency 10% of hard costs; selling costs 3%. Inputs are editable. This is not a cost estimate, market valuation or assurance of sale or planning approval.

Total project cost37,431,610 €
Net exit proceeds35,793,000 €
Project profit / loss-1,638,610 €
ROI over the whole project-4.38 %
Illustrative annualized return-1.11 %
Gross proceeds needed to break even38,589,289 €
Maximum purchase price at target ROINo positive purchase price achieves the target ROI under these assumptions.

ROI = (sale proceeds after selling costs − total project cost) / total project cost. Total cost includes acquisition, purchase costs, construction, design, contingency, extra works and holding costs over the project period.

Unlevered, before income taxes. Construction budgets assume VAT included; no VAT recovery is modelled. No rental income. Annualized = (net exit / total cost)^(1/years) − 1 assuming all costs occur at the start; this is not cash-flow IRR.

Downside: hard costs +15%, exit −15%, duration +1 year. Upside: hard costs −5%, exit +10%, duration −0.5 year. Purchase and other rates remain unchanged.

Basis and assumptions

  • Hard costs: enclosed BGF A 10,803.87 m² × €2,400/m². Hypothetical whole-project exit: 123 × €300,000 = €36.9m, not approved individual apartment sales.
  • No confirmed operator or purchaser, no capitalized invented rent. The €1m extra allowance is not a flood-protection, basement or fit-out estimate.

Verify before acquisition

  • Actual acquisition price, current planning consent, saleable floor area, costs and exit proceeds require independent confirmation.
  • All model returns are hypothetical and may be negative.
Discuss this project ↗
Wilhelm-von-Siemens-Straße 32

Project visualization, not a photograph of a completed building.

ILLUSTRATIVE SCENARIO · NOT A RETURN FORECAST

Wilhelm-von-Siemens-Straße 32

Actual purchase price on request

Open presentation ↗

Project link ↗

The February 2026 student-housing concept is separate from the older medical-use preliminary decision.

Source documents reviewed; current planning status requires confirmation.

ROI over the whole project
ScenarioROIProject profit / loss
Downside-14.08 %-4,232,174 €
Base13.82 %3,688,545 €
Upside30.83 %7,872,368 €
Edit assumptions and recalculate

Model inputs, not seller terms

Purchase costs 10%: 6% transfer tax, assumed 2% notary/register and 2% brokerage; design 15% and contingency 10% of hard costs; selling costs 3%. Inputs are editable. This is not a cost estimate, market valuation or assurance of sale or planning approval.

Total project cost26,683,125 €
Net exit proceeds30,371,670 €
Project profit / loss3,688,545 €
ROI over the whole project13.82 %
Illustrative annualized return3.29 %
Gross proceeds needed to break even27,508,376 €
Maximum purchase price at target ROI2,251,455 €

ROI = (sale proceeds after selling costs − total project cost) / total project cost. Total cost includes acquisition, purchase costs, construction, design, contingency, extra works and holding costs over the project period.

Unlevered, before income taxes. Construction budgets assume VAT included; no VAT recovery is modelled. No rental income. Annualized = (net exit / total cost)^(1/years) − 1 assuming all costs occur at the start; this is not cash-flow IRR.

Downside: hard costs +15%, exit −15%, duration +1 year. Upside: hard costs −5%, exit +10%, duration −0.5 year. Purchase and other rates remain unchanged.

Basis and assumptions

  • Hard costs use 7,455 m² of GFZ calculation area × €2,300/m² as a preliminary proxy, not confirmed BGF. Model exit: 70% of 7,455 m² × €6,000/m².
  • Area efficiency, prices, residential use and saleability are assumptions. No confirmed apartment count or transferred approval from the medical scheme.

Verify before acquisition

  • Actual acquisition price, current planning consent, saleable floor area, costs and exit proceeds require independent confirmation.
  • All model returns are hypothetical and may be negative.
Discuss this project ↗

Unlevered, before income taxes. Construction budgets assume VAT included; no VAT recovery is modelled. No rental income. Annualized = (net exit / total cost)^(1/years) − 1 assuming all costs occur at the start; this is not cash-flow IRR. Downside: hard costs +15%, exit −15%, duration +1 year. Upside: hard costs −5%, exit +10%, duration −0.5 year. Purchase and other rates remain unchanged.

External context: IBB citywide new-build asking-price median, not a valuation of these projects; Berlin tax authority: 6% transfer tax. Other prices and budgets are independent illustrative assumptions. IBB 2025 · Berlin · Grunderwerbsteuer

INMUEBLES DE INVERSIÓN ACTUALES

Inmuebles para tu inversión

Los inmuebles con datos de alquiler aparecen primero. Cada ficha indica la fuente de esos datos.

Rentabilidad bruta del alquiler = alquiler anual sin gastos ÷ precio de compra. Antes de gastos de adquisición y mantenimiento, financiación e impuestos. ·

Tu inmueble. Tu cálculo.

Revisa los detalles del inmueble y ajusta tu escenario de financiación.

EUR · cálculo mensual
Datos del inmueble

Compre un edificio residencial y comercial de 12 habitaciones de alto rendimiento en Rhinow

Precio de compra—
Superficie habitable—
Situación del alquiler—
Clase energética—
Alquiler sin gastos / mes—
Rentabilidad bruta del alquiler—

Lo que debes saber sobre este inmueble

TU RESULTADO MENSUAL

¿Cuánto queda al mes?

Hipótesis de cálculo modificables. No es una oferta de financiación.

¿Aún no tienes tus propias cifras?

Ajustar el préstamo y otras hipótesis +

Fondos propios incluidos los gastos de adquisición. Gastos del propietario incluidas las partidas no repercutibles y tu provisión de reserva periódica. Todos los porcentajes son hipótesis elegidas libremente.

Lo que te queda al mes, antes de impuestos—

Alquiler utilizado en el cálculo—
Tus gastos recurrentes—
Tu cuota del préstamo—
Ver la rentabilidad en porcentaje +

La rentabilidad compara el alquiler anual con el precio de compra. No es el dinero que te queda después de la cuota del préstamo.

Rentabilidad bruta del alquiler—
Rentabilidad neta antes de financiación¹—
¿Qué pasa si baja el alquiler o suben los intereses? +

¹ Alquiler anual tras la pérdida prevista, menos gastos del propietario, dividido entre el precio de compra incluidos los gastos de adquisición. Sin impuestos, revalorización, reformas puntuales ni gastos de venta. Cuota del préstamo calculada como anualidad inicial; no es un cuadro de amortización.

ENTENDIDO EN 30 SEGUNDOS

Así funciona un inmueble alquilado.

Aquí compras un inmueble completo para alquilarlo. No inviertes dinero a través de este sitio web.

1

Compras un inmueble.

Pagas con fondos propios y, si es necesario, con un préstamo. Al precio de compra se añaden los gastos de adquisición.

2

Recibes el alquiler.

Calcula con el alquiler sin calefacción ni gastos de funcionamiento. Los importes destinados a esos gastos no son ingresos de libre disposición.

3

Pagas los gastos.

Se descuentan la cuota del préstamo y tus gastos recurrentes. La calculadora muestra lo que queda después.

Alquiler tras la pérdida prevista−Tus gastos recurrentes−Cuota del préstamo=Lo que queda cada mes
UN BUEN PROCESO. SIN ATAJOS.

De los documentos a una decisión clara.

01

Ver el conjunto.

La ficha del inmueble, el contrato de alquiler, el plan económico de la comunidad y el estado del inmueble ofrecen una visión conjunta.

02

Calcular en detalle.

Alquiler, financiación y gastos recurrentes. Con tus hipótesis y teniendo en cuenta los riesgos.

03

Aclararlo personalmente.

Comentar las cuestiones pendientes y las condiciones antes de dar el siguiente paso.

BUENAS PREGUNTAS, RESPUESTAS SENCILLAS

Lo que deberías entender antes de comprar.

¿«Alquiler» significa automáticamente «beneficio»?

No. Del alquiler se descuentan los gastos recurrentes y, si corresponde, la cuota del préstamo. La calculadora muestra lo que queda después, antes de impuestos.

¿Qué significa un resultado negativo?

En este cálculo, el alquiler introducido no cubre todos los gastos. Debes aportar cada mes la cantidad indicada con otros fondos.

¿Por qué hay campos vacíos?

Aún no hay datos verificados para este inmueble. No inventamos un alquiler. Introduce los valores conocidos o revisa los documentos con nosotros.

¿Puedo confiar en el resultado?

Es una simulación basada en tus datos, no una garantía. Un alquiler menor, reparaciones u otras condiciones del préstamo cambian el resultado. No se incluyen impuestos, reformas puntuales ni gastos de venta.

¿Qué ocurre cuando envío una consulta?

Everpeak recibe tus datos de contacto, el inmueble elegido y tu cálculo. Así podemos comentar contigo las cuestiones pendientes. La consulta no supone la compra de un inmueble.

EVERPEAK PRIVATE

Desde 1 millón de euros. Tu capital. Tu perspectiva.

Consultar sobre inversión privada ↗
5,0 ★★★★★

33 reseñas en google

«Excelente comunicación y servicio. Pavel es receptivo, accesible y un verdadero profesional.» — Angela

«Está del lado del cliente y defiende sus intereses, ¡algo raro en Berlín! Altamente recomendado.» — Artem S.

«Cada vez el resultado fue incluso mejor de lo que habíamos planeado.» — Natalia H.

Traducido del ruso

Leer todas las reseñas en Google

EL SIGUIENTE PASO

Tus preguntas. Nuestra visión conjunta.

Comentamos el inmueble y tu escenario de cálculo.
De forma personal, concreta y sin compromiso.

Al enviar tu consulta, transmites a Everpeak tus datos de contacto y el escenario de cálculo actual. Información de privacidad